2 out of 2 SOV Working & Configuration
2 out of 2 sov is used to reduce the failure rate of the field instrument. When a single instrument is used, its failure rate is greater than two out of two sov. Reasons for failure of single instrument :– 1. Single DO(Digital Output) assignment. 2. Single cable from control room to field. 3.Single instrument …